The seismic protection and vibration control of non-structural elements in the Taypa Textile Factory project in Serbia, with 600 employees and 20.00 m2 closed area, was provided by DKM Construction & Consultancy.
The seismic protection and vibration control of non-structural elements in the Taypa Textile Factory project in Serbia, with 600 employees and 20.00 m2 closed area, was provided by DKM Construction & Consultancy.