The usage area of Al Sunbula Stadium in Iraq is 30,000 square meters and its capacity is 30,000 spectators. Alsunbula Stadium will be built on an area of approximately 250,000 square meters, with training areas, parks and landscaping areas.
Tunex Impact Sound Insulation Membrane, one of the DKM Construction & Consultancy products, was preferred in the project.